R2H

Town Center Park, Phase II
Santee, CA

The project is the development of over 30 acres.  Included in this development is a new sport complex, athletic fields for soccer and football, an entertainment venue and multi-use trails and playgrounds.

R2H provided the following:

  • Design of reinforced C.M.U. wall sections for heights of 6 ft. to 12 ft..  Each height was designed for a level and sloping (2:1) backfill condition.  (14 wall sections total.)
  • Designed abutments for 2 pedestrian bridges.
  • Reviewed retaining wall sections at the stadium seating design by others.
  • Reviewed foundation of 70 ft. high safety netting/fence poles design by others.

R2H provided structural engineering design services to the project team.  This involved preparing the structural calculations R2H also prepared the structural drawings and specifications.

Service by Design